Know What Might Be Moved
Tip No. 3: Know what might be moved
Once
you've figured out the components that are absolutely required to be moved from
the current platform, you should fully analyze what you may want to migrate or
leave behind. There are always system components that don't have to be migrated
to the new platform but perhaps should be in order to minimize downtime and
complexity.
For
example, Windows system state information might be moveable (with the right
tools) from one hardware platform to another. If this information can be
migrated, then configuration of the new server becomes dramatically less
complex, at least from a Windows and software perspective.
Tip No. 4: Set expectations and
stick to your guns
Expect
users to demand zero-downtime migrations from you and your staff. The
unfortunate reality is that this dream of zero downtime is often impossible in
the real world of migration. Even if you can physically migrate without visible
downtime (such as for mailbox migrations in Exchange or Notes), you still want
to give your staff some breathing room to deal with the unexpected. Granted, moving
system state information and binaries, planning well and doing everything you
can possibly accomplish ahead of time will minimize downtime. However, a
promise to eliminate all downtime during major hardware migrations is one you
will not likely be able to keep.
Set a
realistic amount of downtime and make sure everyone from the IT staff to the
users knows when to expect it and how long it is likely to last. If that is
still unacceptable to the users, explain why you must disagree because of the
potentially catastrophic risk that their demands pose to the system.
Tip No. 5: Get the tools you need
Migrations
can often lead to unexpected consequences because someone didn't read the fine
print. One example: many native Physical to Virtual (P2V)
tools require that data be in a "quiesced (database administrator transactions
only) state" during the migration. For SQL or similar servers, this means the
databases must remain offline during migration because of a major risk of data
loss during the procedure. P2V tools also tend to be one-way prospects from
your physical servers to virtual machines. This isn't a failing of the tools
but rather a limitation of their operation. That's fine if your migration is
only P2V but doesn't help if you're trying to move to another physical
platform. They also can't help if you find that, after migration, an
application doesn't behave as expected in the new environment.
Having the
right arsenal of tools for your needs-and typically a mix of native and
third-party tools-will ensure that you can perform the types of migrations
you're looking to do safely, along with a "rip and revert" plan in case things
don't go as planned. Through a combination of these five tips, you can ensure
you don't leave anything behind, and that you can move to the new platform with
minimal and reasonable downtime for the migration operation.
Michael DeNapoli is a Solution
Architect for Vision Solutions. He can be reached at michael.denapoli@visionsolutions.com.